Friday, September 18, 2009

Interior framing

So two exciting new accomplishments as of last weekend. One, some of the interior framing has begun. It's incredibly exciting to walk around what will be distinct rooms! Two, Moe and his crew have almost finished the exterior grading work. The stone retaining wall looks so nice and has a really natural feel to it. We're really happy with how it turned out. Next up: putting on the porch, the metal roof, the siding, and installing windows and doors. More progress photos to come soon!

Our living/dining room with side door that will lead out onto porch and backyard


Kitchen


Awesome walk-in pantry!


Master bedroom; bed will be placed between these two windows


Looking into master bathroom from bedroom


Our bathtub!


Top of the stairs, site of our home office


The nursery!


Second floor bathroom (with guest bedroom visible through the wall behind it)


Looking down the stairs


Stone retaining wall around the walk-out basement